1 Commits
Author SHA1 Message Date
Jim BassoandClaude Opus 4.8 830eb4f6dc Add TODO.md backlog and docs/DESIGN.md (original plan)
Build & Push Docker image / docker (push) Successful in 1m15s
Build & Push Docker image / test (push) Successful in 45s
Track the project backlog in-repo and preserve the original pre-implementation
design with a note on where the build diverged.

Co-Authored-By: Claude Opus 4.8 <[email protected]>
2026-06-11 15:50:18 -05:00